EDIFACT message guide · Transport
TANSTA Tank status report
The UN/EDIFACT message exchanged between a vessel and the ship planning department with the contents of ballast, fuel, water and other tanks.
- Sent by
- Vessel or shipping line's ship planning department
- Received by
- Ship planning department or vessel
- Standard
- UN/EDIFACT · Batch message
- X12 equivalent
- No direct equivalent
What is the EDIFACT TANSTA message?
TANSTA is the UN/EDIFACT tank status report. The directory defines it as a message from a vessel to the ship planning department of a shipping line, or the reverse, for example via satellite, giving details of the contents of ballast tanks, fuel tanks, water tanks and other figures needed to calculate the vessel's stability.
Stowage planners need the weight in each tank to calculate stability and stress before deciding how to load containers at the next port. The tank report gives them current figures from the ship.
How to read this diagram: the top row shows who sends TANSTA, to whom, and which messages usually come before and after it. The lower part shows what the directory D.21A itself requires: the envelopes around TANSTA and the segments and segment groups it marks mandatory. Conditional groups are listed by their trigger segment rather than drawn in full. This is the directory's minimum, not a trading partner's requirement: a message implementation guide, such as an industry subset or a partner’s own guide, usually makes some conditional groups mandatory, restricts the codes and may use an older directory.
When it is used
- Reporting tank contents before arrival at a port
- Supporting stability and stress calculations
- Planning ballast operations with the stowage plan
Where it fits in the message flow
Structure
Mandatory segments in TANSTA (directory D.21A)
In UN/EDIFACT directory D.21A, the TANSTA message has 16 segment positions arranged in 3 segment groups. These are the segments and segment groups marked mandatory at message level, in order; a mandatory group is shown with the segment that starts it. Segments inside conditional groups are needed only when the group is used. This is the directory’s requirement, not your trading partner’s: each partner’s message implementation guide names the directory it uses, often an older one such as D.96A or D.01B where the structure can differ, makes some conditional segments mandatory and restricts the codes.
- UNH
- BGM
- DTM
- SG2 (TDT)
- UNT
Practical example
TANSTA in practice
A container vessel approaches its next port. The chief officer sends the line's ship planning department a TANSTA with the current contents of every ballast, fuel and fresh water tank. The planners combine it with the bayplan to calculate stability, then send the terminal stowage instructions with MOVINS.
Implementation
Implementation considerations for TANSTA
- Send current figures shortly before planning starts.
- Use tank identifiers consistent with the vessel's stability model.
- Allow for limited bandwidth on ship-to-shore links.
- Validate figures against tank capacities.
How ECOM helps
Automate TANSTA with ECOM
Industry
Trucking and Transportation
Load tenders, responses, status and freight invoices for carriers, brokers and shippers, integrated with the TMS.
Solution
Logistics Automation
Automate tenders, status updates, freight invoices and warehouse orders with logistics partners.
Solution
EDI Integration
Exchange X12 and EDIFACT documents with partners and integrate them directly with your ERP.
Compare X12 and EDIFACT, or see answers to general questions in the EDI FAQ.
Related messages
Related transport messages
- MOVINSStowage instruction
- BAPLIEBayplan/stowage plan occupied and empty locations
- BERMANBerth management
- BMISRMBulk marine inspection summary report
- CALINFVessel call information
- COARRIContainer discharge/loading report
- CODECOContainer gate
- COEDORTransport equipment stock and profile report
- COHAORContainer special handling order
- COPARNContainer announcement
- COPINOContainer pre-notification
- COPRARContainer discharge/loading order
Need help with TANSTA?
ECOM maps, tests and monitors EDIFACT messages for your trading partners and integrates them with your ERP.