X12 transaction guide · Planning
EDI 862 Shipping Schedule
The X12 document a manufacturer sends to give suppliers firm, near-term shipping requirements, usually daily.
- Sent by
- Manufacturer or buyer
- Received by
- Supplier
- Standard
- ANSI ASC X12
- EDIFACT equivalent
- DELJIT
What is an EDI 862?
The EDI 862 Shipping Schedule is the ANSI X12 transaction set manufacturers use to give suppliers precise, near-term shipping requirements. Where the 830 provides a longer forecast, the 862 specifies exact quantities and ship or delivery dates, often by day, for the coming days or weeks.
The 862 supplements the 830 rather than replacing it. It supersedes the shipping detail of the planning schedule for the period it covers, while the 830 continues to guide longer-term planning. Suppliers ship against the 862 and confirm each shipment with an 856 advance ship notice.
How to read this diagram: the top row shows who sends the 862, to whom, and which documents usually come before and after it. The lower part shows what X12 release 004010 itself requires: the envelopes around the 862 and the segments and loops the standard marks as required, area by area. Optional loops are listed by the segment that starts them rather than drawn in full. This is the standard's minimum, not a trading partner's requirement: each partner's implementation guide usually makes some optional loops mandatory, restricts the codes and may use a different release.
When it is used
- Just-in-time and just-in-sequence automotive supply
- Daily delivery requirements for production plants
- Short-term adjustments to the planning schedule
Where it fits in the document flow
Structure
Key segments in the 862
The segments most implementations use, described in plain language. The last column shows what X12 release 004010 itself requires: "Required" marks a segment the standard requires in every 862; "Optional, common" marks a segment the standard leaves optional, or that sits in an optional loop, but that implementations often use. This is the standard's requirement, not your trading partner's: each partner's implementation guide names the release it uses, makes some optional segments mandatory and restricts the values, and requirements can differ between releases. The requirement status comes from one published X12 reference listing and has not been checked against a second source.
| Segment | Name | What it carries | In X12 004010 |
|---|---|---|---|
| BSS | Beginning Segment for Shipping Schedule | Purpose code, schedule reference number, date, schedule type and the horizon start and end dates. | Required |
| N1 loop | Party Identification | Ship-to plant and supplier. | Optional, common |
| LIN | Item Identification | Buyer part number and other identifiers. | Required |
| UIT | Unit Detail | Unit of measure. | Required |
| SHP | Shipped/Received Information | Last shipment quantity and date, used to reconcile requirements. | Optional, common |
| FST | Forecast Schedule | Firm quantities with daily or other time buckets and dates. | Optional, common |
Example
Sample EDI 862
A shipping schedule for part 12345-AB requiring 240 firm units (C) on each of two days (D). SHP reports the last shipment of 480 units for reconciliation.
Illustrative data only, not tied to one X12 release or trading partner. The interchange (ISA/IEA) and functional group (GS/GE) envelopes are omitted for readability.
ST*862*0001~
BSS*05*SS001*20261020*DL*20261103*20261109~
N1*ST*Example Plant*92*P01~
LIN**BP*12345-AB~
UIT*EA~
SHP*01*480*011*20261020~
FST*240*C*D*20261103~
FST*240*C*D*20261105~
SE*9*0001~ The sample is the same one shown above, with a note beside each segment the first time it appears. Segment IDs are highlighted at the start of each line; the fields after them are separated by asterisks, and each segment ends with a tilde.
Avoid problems
Common 862 errors and how to prevent them
Duplicating 830 demand
The 862 supersedes the 830's shipping detail for its horizon. Adding both double counts demand.
Ignoring the last-shipment reference
Requirements assume the customer received the last shipment listed. Reconcile against SHP before planning.
Late ship notices
Each shipment against an 862 needs an accurate and timely 856.
How ECOM helps
Automate the 862 with ECOM
Industry
Automotive
Schedules, ship notices, labels, self-billing and multi-plant routing for automotive suppliers.
Solution
ERP Integration
Connect your ERP to trading partners through EDI, APIs, IDocs, files and connectors.
Product
PRISM-SCV
Order lifecycle visibility, response monitoring, routed alerts and business-identifier search across your B2B transactions.
EDI 862 FAQs
Does the 862 replace the 830?
No. It supersedes the 830's shipping detail for the short-term horizon while the 830 continues to guide longer-term planning.
Which industries use the 862?
Primarily automotive and other manufacturing supply chains with frequent, scheduled deliveries.
What is the EDIFACT equivalent of the 862?
The UN/EDIFACT equivalent is the DELJIT delivery just-in-time message.
More general questions about EDI are answered in the EDI FAQ.
Related transactions
Related planning documents
Need help with the EDI 862?
ECOM maps, tests and monitors X12 documents for your trading partners and integrates them with your ERP.




